Some more electrical wiring has been installed.
The bath in daylight
The "builder's doors" have been installed in the garage and on the front of the house in preparation for the lock-up stage.
The solar panel for the hot water service was installed this week.
More brickwork was done today on the other side of the house.
The plumbers have been working on the house this week.
The electricity box, with the yellow gas pipe alongside it, will eventually connect to the hot water service.
Finally, what is a visit to the block without Miss Erin climbing up to the top of the mound of dirt in the backyard.