Sunday, 24 July 2011

The missing pipe


The missing pipe was finally laid into the correct place today, the plastic was pulled back by the plumbers to ensure its correct position.  I am so grateful that DJ is so meticulous with checking the plans and being so precise about things.  It would have been dreadful for them to have to cut into the slab to put in this one pipe!  Way to go DJ :-)

1 comment:

  1. Just wondering why DJ has never been so meticulous when it came to LIMS or his AMEX card ... :-)

    ReplyDelete